Bill of Materials and Production Orders in a Small Factory
A bill of materials and a production order are two simple ideas that bring order to a factory. The first says what a product needs. The second says how many you are making now. Together they let you plan purchases, control the store and learn your real wastage. This guide explains how to set them up, using a simple example, and what to watch for on the factory floor.
What goes into a bill of materials
A bill of materials, or BOM, lists every material required to make a standard quantity of one product, which might be one piece or one batch. Choose a standard quantity that is easy to measure. For a biscuit maker the standard might be one batch of a specified number of packets. For a chair maker it is one chair.
- Raw materials: quantity of each per standard output, in a consistent unit.
- Packaging: cartons, wrappers, labels, tape.
- Expected wastage: a percentage per material based on experience, not hope.
- By-products: trimmings or off-cuts you can sell or reuse.
- Labour and machine time: expected hours, if you cost by time.
An example: simple wooden shelf
| Material | Quantity per shelf | Expected wastage |
|---|---|---|
| Board sheet | One sheet | Trimming loss as you measure it |
| Edge strip | Several metres | Small cutting loss |
| Screws and fittings | A packet | Few breakages |
| Polish or paint | A measured amount | Spillage |
| Packing material | One set | None |
The numbers in your BOM come from measuring a few real runs, not from a catalogue. Weigh or count what is actually used and average it. Update the BOM when you change a supplier, a grade or a method.
Raising a production order
A production order records a decision: make this quantity of this product by this date, for stock or for a customer. It shows planned quantity, planned materials from the BOM, the start date, the target date and status. When an order is created, the software can tell you whether the store has enough material and what needs to be bought.
- Choose the product and the quantity.
- Check the requirement list against the store balance.
- Raise purchase requests for shortages.
- Confirm the order and assign a supervisor and start date.
Issuing raw material
The store keeper issues material against the order, not against a person. Each issue slip names the order, the material and the quantity. The system compares total issues with the BOM requirement. If more is issued than planned, it should ask for a reason. This single control often reveals the biggest hidden waste in a small factory.
When material comes back unused, record the return with the order number. If you do not, the order will look more expensive than it was and your store balance will drift.
Recording output and wastage
At the end of the run, record good output, rejected output and scrap. The system calculates yield and the difference between standard and actual material use. If the shelf order needed ten sheets and took eleven, the extra sheet appears as a variance. You can then ask why: poor cutting, a defective sheet, a design change or theft.
- Record rework separately from scrap so you see how much was saved.
- Record by-products as stock where they have value.
- Note the shift and machine so patterns appear over time.
Closing the order and costing it
When output is recorded, finished stock rises and the order is closed. The software then adds the cost of materials issued, labour assigned and your overhead rate to produce a cost per unit. Compare this with your price list. Do this for the first five orders of each product and you will probably find one or two where the margin is smaller than you thought.
Working with semi-finished goods
Some products have stages. A garment is cut, stitched and finished. A food product is mixed, cooked and packed. Treat each stage as a mini order with its own BOM and output, so that the stitched garments or the cooked mix are inventory in their own right. This helps when the stages happen on different days or in different rooms, and when a stage has its own wastage.
Small habits that make the system work
- No material leaves the store without an order number.
- Output is entered on the same day.
- Changes to BOMs are signed off by the owner.
- The supervisor reviews the variance report weekly.
Common setup mistakes
Many units copy a BOM from a supplier brochure that does not match their real process. Others forget packaging, or the oil used in the machine, or the gas for heating. Some mix units, such as kilograms in the BOM and bags in the store, without a conversion. Test every BOM with a real run and correct it before relying on the figures.
See how the WebsNP factory production software manages recipes, orders, issue slips and costing. Its stock features overlap with inventory management software, which you can compare. Message us on WhatsApp with your first BOM and we will enter it in a demo.
Get a demo and quote for Factory Production Software
Tell us about your business and we will reply the same working day with a demo and a clear quote. No obligation.
Chat on WhatsAppOr call / WhatsApp +977 9846280400
More guides on Factory Production Software
How to Choose Production Software for a Small Factory
Choose production software with confidence. Check recipes, wastage, costing, stock and support, and test the demo on one real product.
Read guide โบRunning a Small Factory in Nepal: Power, Raw Material, VAT
Four local pressures on small manufacturers in Nepal and the production records that help you plan around them.
Read guide โบFactory Software vs Excel: Production Costing and Payback
Excel serves many factories for years. Learn where it starts to fail, what production software costs and how to judge payback honestly.
Read guide โบSmall Factory Production Mistakes and a Weekly Checklist
Ten mistakes that quietly cost small factories money, and a weekly checklist that catches them early.
Read guide โบ